METANOR RESOURCES INC.
TSX VENTURE : MTO

METANOR RESOURCES INC.

November 13, 2009 08:30 ET

Metanor Drills 3.13 g/t Au Over 38.4m (90% True Width) at Barry Extending the Central Zone

VAL-D'OR, QUEBEC, CANADA--(Marketwire - Nov. 13, 2009) - Metanor Resources Inc. (TSX VENTURE:MTO) is pleased to announce new results of the drilling campaign currently underway on the Barry property. The current drilling campaign investigated the Central zone towards the west and at various depths. This mineralized zone is located on the south side (Hanging wall) of the deformation corridor and extends to the west of zone 43.



---------------------------------------------------------------------
Section Ddh Zone Eleva- From To Width Au
tion (m) (g/t)
---------------------------------------------------------------------
770 E MB-09-431 Main -45m 64.5 69.0 4.5 3.20
---------------------------------------------------------------------
810 E MB-09-406 Inter -50m 69.5 80.0 10.5 2.95
---------------------------------------------------------------------
And Main -80m 110.0 113.0 3.0 3.98
---------------------------------------------------------------------
820 E MB-09-444 31.5 69.9 38.4 3.13
---------------------------------------------------------------------
Including Centre -27m 31.5 43.5 12.0 3.93
---------------------------------------------------------------------
And Inter -45m 54.0 69.9 15.9 4.52
---------------------------------------------------------------------
830 E MB-09-443 Centre 21.0 33.0 12.0 2.88
---------------------------------------------------------------------
Including Centre -20m 28.5 33.0 4.5 6.07
---------------------------------------------------------------------
And Main 100.5 109.5 9.0 2.42
---------------------------------------------------------------------
Including Main -80m 100.5 106.0 5.5 3.56
---------------------------------------------------------------------
840 E MB-09-440 Sud -5m 11.5 14.5 3.0 3.12
---------------------------------------------------------------------
Centre -25m 23.5 44.5 21.0 3.40
---------------------------------------------------------------------
Including Centre 23.5 31.0 7.5 4.35
---------------------------------------------------------------------
And Centre 38.5 44.5 6.0 5.65
---------------------------------------------------------------------
Inter -47m 65.5 70.8 5.3 6.01
---------------------------------------------------------------------
Main -80m 110.5 115.0 4.5 3.51
---------------------------------------------------------------------
Including Main 110.5 113.5 3.0 5.27
---------------------------------------------------------------------
865 E MB-09-441 Centre -40m 48.0 54.0 6.0 5.06
---------------------------------------------------------------------


This drilling campaign confirmed the presence of mineralized zones (Inter) in the centre of the deformation corridor and located between Main zone (footwall side) and zones 43 and Central zone (hanging wall side). Results obtained with this diamond drilling campaign confirm the potential to define new resources in all gold bearing zones in the corridor of deformation which crosses the Barry property. Other assay results are still pending.

The true width is approximately 90 % of the core length obtained in diamond drill holes. Analyses were performed by fire assay at the Bachelor Mine laboratory.

Mr. Andre Tremblay, P Eng. is the qualified person pursuant to National Instrument 43-101 and supervised the technical information presented in the news release.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

105,807,582 outstanding shares

Contact Information