Rambler Continues to Expand the 1807 Zone

LONDON, ENGLAND and BAIE VERTE, NEWFOUNDLAND AND LABRADOR--(Marketwire - Oct. 29, 2007) - Rambler Metals and Mining plc (TSX VENTURE:RAB)(AIM:RMM) is pleased to announce drill intersections from its ongoing surface drilling program.

- RM07-20e returns 17.06 feet of 3.4% copper on the 1807 Zone.

1807 Zone

With Rambler's directional drilling the 1807 zone has begun to develop into a significant mineralized horizon. The initial holes on the RM07-20 setup have defined the eastern edge of the mineralization while this latest hole, RM07-20e, confirms the zone's ability to produce exceptional copper grades over significant widths.

Additional holes are planned on the RM20 setup to further define the zone's eastern and western extents. The 1807 mineralization remains open at depth.



--------------------------------------------------------------------------
From To Length Length Cu Au
Hole (m) (m) (m) (feet) (%) (g/T)
--------------------------------------------------------------------------
RM07-20c 665.30 666.30 1.00 3.28 2.64 2.48
RM07-20d Eastern Limit of 1807 Zone - No Significant Mineralization
RM07-20e 659.60 662.80 3.20 10.50 5.5 1.53


For more information and a complete listing of all RMM drill intersections, corresponding maps, figures and NI43-101 compliance information please visit our website at www.ramblermines.com.

George Ogilvie, Vice President and COO reports:

"The mineralization both in width and grade continues to show the significance of the 1807 Zone. The RM07-20e hole, in particular, demonstrates the potential not just down plunge of previous mineralized holes but to the west. This hole has sparked new enthusiasm that additional mineralized zones could exist to the west and more importantly closer to surface."

Larry Pilgram, P.Geo. is the Qualified Person responsible for the technical content of this release. Mr. Pilgram an independent consultant contracted by Rambler Metals and Mining plc.

All tonnes are dry metric tonnes.

Drill intercepts quoted are core lengths; true widths are estimated to be 90% to 95% of the intersected core lengths. Analytical results for Rambler core in this press release were determined at Eastern Analytical, Springdale, NL. Samples are then shipped by courier to Activation Laboratories Ltd., Ancaster, Ontario, where a 34 element ICP analysis and gold fire assay are performed.

National Instrument 43-101 compliance information regarding sampling and analytical protocols pertaining to the Rambler Project can be accessed via the following link: http://www.ramblermines.com.

Contact Information

  • Rambler Metals and Mining Canada Limited
    George Ogilvie, P.Eng.
    VP & COO
    (709) 532-4990
    or
    Rambler Metals and Mining Plc
    Leslie Little
    Company Secretary
    +44 (0) 20-7661-8104
    Website: www.ramblermines.com
    or
    Insinger de Beaufort
    Nandita Sahgal
    +44 (0) 20-7190-7000
    or
    Pelham Public Relations
    Chelsea Hayes
    +44 (0) 20-7743-6675