Alabama Graphite Corp. Announces Results of 2016 Annual General Meeting of Shareholders

Advancing a Battery-Grade Graphite Project in the United States of America


TORONTO, ONTARIO--(Marketwired - March 1, 2016) - Alabama Graphite Corp. ("AGC" or the "Corporation") (TSX VENTURE:ALP)(OTCQX:ABGPF)(FRANKFURT:1AG) announces the results of its Annual General Meeting of Shareholders ("AGM") held on February 26, 2016 in Toronto. The following four nominees were re-elected as Directors of the Corporation to serve until the next annual meeting of shareholders of the Corporation, or until their successors are elected or appointed. The results of the voting were as follows:

Name of Nominee Percent Votes For Percent Votes Withheld
Donald Baxter 97.17% 2.83%
Jean Depatie 97.17% 2.83%
Daniel Goffaux 97.33% 2.67%
H. David Ramm 95.35% 4.65%

Six percent of all issued and outstanding shares of the Corporation were represented at the meeting.

Additionally, the following resolutions were passed:

  • Approval of the appointment of DeVisser Gray LLP, Chartered Accountants, as auditors for the ensuing year at a remuneration to be fixed by the directors;
  • Approval of the total number of Directors at four for the upcoming fiscal year; and
  • Re-approval of the amended and restated stock option plan of the Corporation for 2016.

Mr. Baxter stated, "I was impressed by the number of attendees and by the interest our shareholders expressed during the meeting. This is a testament to the outstanding work the AGC team has been doing. Our shareholder comments and observations were very astute and their unwavering support is greatly appreciated."

On behalf of the Board of Directors

Donald Baxter, President and Chief Executive Officer

About Alabama Graphite Corp.

Alabama Graphite Corp. is a Canadian-based flake graphite exploration and development company as well as an aspiring battery materials production and technology company. The Company operates through its wholly owned subsidiary, Alabama Graphite Company Inc. (a company registered in the state of Alabama). With an advancing flake graphite project in the United States of America, Alabama Graphite Corp intends to become a reliable, long-term U.S. supplier of specialty high-purity graphite products. A highly experienced team leads the Company with more than 100 years of combined graphite mining, graphite processing, specialty graphite products and applications, and graphite sales experience. Alabama Graphite Corp. is focused on the exploration and development of its flagship Coosa Graphite Project in Coosa County, Alabama, and its Bama Mine Project in Chilton County, Alabama as well the research and development of its proprietary manufacturing and technological processing process of battery materials.

Alabama Graphite Corp. holds a 100% interest in the mineral rights for these two U.S.-based graphite projects, which are both located on private land. The two projects encompass more than 43,000 acres and are located in a geopolitically stable, mining-friendly jurisdiction with significant historical production of crystalline flake graphite in the flake graphite belt of central Alabama, also known as the Alabama Graphite Belt (source: U.S. Bureau of Mines). A significant portion of the Alabama deposits are characterized by graphite-bearing material that is oxidized and has been weathered into extremely soft rock. Both projects have infrastructure in place, are within close proximity to major highways, rail, power and water, and are approximately three hours (by truck or train) to the Port of Mobile, the Alabama Port Authority's deep-seawater port and the ninth largest port by tonnage in the United States (source: U.S. Army Corps of Engineers/USACE). The state of Alabama's hospitable climate allows for year-round mining operations and the world's largest marble quarry (which operates 24 hours a day, 365 days a year in Sylacauga, Alabama), is located within a 30-minute drive of the Coosa Graphite Project.

On November 30, 2015, Alabama Graphite Corp. announced the results of PEA for the Coosa Graphite Project, indicating a potentially low-cost project with potential positive economics. Please refer to the Company's technical report titled "Alabama Graphite Corp. Preliminary Economic Assessment (PEA) on the Coosa graphite Project, Alabama, USA" dated November 27, 2015, prepared by independent engineering firms AGP Mining Consultants Inc. and Metal Mining Consultants Inc., and filed on SEDAR at www.sedar.com.

Note: a preliminary economic assessment is preliminary in nature, it includes inferred mineral resources that are considered too speculative geologically to have economic considerations applied to them that would enable them to be categorized as mineral reserves and there is no certainty that the preliminary economic assessment will be realized.

*Inferred Mineral Resources represent material that is considered too speculative to be included in economic evaluations. Additional trenching and/or drilling will be required to convert Inferred Mineral Resources to Measured or Indicated Mineral Resources. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. There is no guarantee that all or any part of the Mineral Resource will be converted into a Mineral Reserve.

For further information and updates on the Company or to sign up for Alabama Graphite Corp. News, please visit www.alabamagraphite.com or follow us on Twitter, Facebook and LinkedIn.

Disclaimer for Forward-Looking Information

This press release contains forward-looking information under applicable Canadian securities laws ("forward-looking statements") that are based on the beliefs of management and reflect Alabama Graphite Corp.'s current expectations. When used in this press release, the words "estimate", "project", "belief", "anticipate", "intend", "expect", "plan", "predict", "may" or "should" and the negative of these words or such variations thereon or comparable terminology are intended to identify forward-looking statements. Such statements reflect the current view of Alabama Graphite Corp. with respect to risks and uncertainties that may cause actual results to differ materially from those contemplated in those forward-looking statements.

By their nature, forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause our actual results, performance or achievements, or other future events, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. Such factors include, among other things, the interpretation and actual results of current exploration activities; changes in project parameters as plans continue to be refined; future prices of graphite; possible variations in grade or recovery rates; failure of equipment or processes to operate as anticipated; the failure of contracted parties to perform; labor disputes and other risks of the mining industry; delays in obtaining governmental approvals or financing or in the completion of exploration, as well as those factors disclosed in the Company's publicly filed documents. Forward-looking statements are also based on a number of assumptions, including that contracted parties provide goods and/or services on the agreed timeframes, that equipment necessary for exploration is available as scheduled and does not incur unforeseen breakdowns, that no labor shortages or delays are incurred, that plant and equipment function as specified, that no unusual geological or technical problems occur, and that laboratory and other related services are available and perform as contracted.

Forward-looking statements are made based on management's beliefs, estimates and opinions on the date that statements are made and Alabama Graphite Corp. undertakes no obligation to update forward-looking statements (unless required by law) if these beliefs, estimates and opinions or other circumstances should change. Investors are cautioned against attributing undue certainty to forward-looking statements.

Alabama Graphite Corp. cautions that the foregoing list of material factors and assumptions are not exhaustive. When relying on Alabama Graphite Corp. forward-looking statements to make decisions, investors and others should carefully consider the foregoing factors and assumptions and other uncertainties and potential events. Alabama Graphite Corp. has also assumed that the material factors and assumptions will not cause any forward-looking statements to differ materially from actual results or events. However, the list of these factors and assumptions is not exhaustive and is subject to change and there can be no assurance that such assumptions will reflect the actual outcome of such items or factors.

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICE PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THE CONTENT OF THIS NEWS RELEASE.

Website / LinkedIn / Facebook / Twitter

Contact Information:

Alabama Graphite Corp.
Ann-Marie M. Pamplin, BA (Hons), BEd
Director of Investor Relations
+1 (416) 309-8641
apamplin@alabamagraphite.com
www.alabamagraphite.com

Alabama Graphite Corp.
First Canadian Place
100 King Street West, Suite 5700
Toronto, Ontario
M5X 1C7
CANADA