Aura Minerals Intersects 21.00 Metres of 7.57% Cu, 1.47 g/t Au and 38.70 g/t Ag in New Calcocita Zone

VANCOUVER, BRITISH COLUMBIA--(Marketwire - March 3, 2009) - Aura Minerals Inc. ("Aura Minerals" or the "Company") (TSX:ORA) is pleased to release additional drill hole results from its wholly owned Aranzazu Project in Zacatecas State, Mexico.

These results include the last set of holes drilled as part of the previous operator's 2007/08 40,000-metre drill program ("2007/08 Program") and drill holes completed by Aura Minerals in late 2008, which include holes drilled as part of a follow-up program to the 2007/08 Program (see Maps 1, 2 and 3: http://media3.marketwire.com/docs/0303ora.pdf).

This most recent drilling by Aura Minerals targeted the high-grade ore chutes which will become part of the new mine plan for re-start of operations. Of significant interest is that the drilling intercepted a new splay chute, the "Calcocita Zone", off the main skarn mineralization. This Calcocita Zone is approximately 15 metres true width and appears to host potential for significant high-grade mineralization just 50 metres from the existing adit. This would therefore reduce the required mine development and capital costs for the potential 2010 re-start of operations.

Highlights from Calcocita Zone include:

- Hole UAZ-009 which returned 21.00 metres of 7.57% Cu, 1.47 g/t Au and 38.70 g/t Ag;

- Hole UAZ-010 which returned 15.82 metres of 2.92% Cu, 1.37 g/t Au and 33.66 g/t Ag;

- Hole UAZ-014 which returned 15.00 metres of 1.28% Cu, 0.48 g/t Au and 20.70 g/t Ag; and

- Hole UAZ-015 which returned 16.50 metres of 2.00% Cu, 0.51g/t Au and 18.62 g/t Ag.

Additional highlights from this recent Aura Minerals drilling include:

- Hole AZR-003 which returned 47.24 metres of 3.33% Cu, 4.22 g/t Au and 45.50 g/t Ag;(i)

- Hole AZR-005 which returned 41.15 metres of 1.61% Cu, 1.96 g/t Au and 20.50 g/t Ag;

- Hole AZR-011 which returned 15.20 metres of 2.71% Cu, 1.98 g/t Au and 36.10 g/t Ag;

- Hole AZR-013 which returned 22.86 metres of 1.23% Cu, 0.95 g/t Au and 11.30 g/t Ag;

- Hole AZR-014 which returned 25.91 metres of 1.60% Cu, 1.39 g/t Au and 22.40 g/t Ag;

- Hole AZR-015 which returned 68.58 metres of 1.35% Cu, 1.98 g/t Au and 17.60 g/t Ag;

- Hole AZR-016 which returned 16.76 metres of 2.88% Cu, 1.23 g/t Au and 28.50 g/t Ag and a further 50.29 metres of 1.12% Cu, 0.70 g/t Au and 8.50 g/t Ag;

- Hole AZR-018 which returned 6.10 metres of 2.36% Cu, 0.77 g/t Au and 34.00 g/t Ag and a further 12.19 metres of 2.59% Cu, 1.90 g/t Au and 18.80 g/t Ag;

- Hole AZR-020 which returned 33.53 metres of 2.88% Cu, 0.86 g/t Au and 22.80 g/t Ag;

- Hole AZR-021 which returned 18.29 metres of 2.75% Cu, 0.83 g/t Au and 10.20 g/t Ag;

- Hole AZR-022 which returned 30.48 metres of 1.84% Cu, 0.74 g/t Au and 18.50 g/t Ag;

- Hole AZR-023 which returned 9.14 metres of 2.09% Cu, 0.79 g/t Au and 22.60 g/t Ag;

- Hole AZR-024 which returned 16.76 metres of 2.26% Cu, 0.38 g/t Au and 25.50 g/t Ag;

- Hole AZR-025 which returned 10.67 metres of 2.18% Cu, 1.83 g/t Au and 10.80 g/t Ag and a further 51.82 metres of 1.29% Cu, 0.61 g/t Au and 9.70 g/t Ag;

- Hole AZR-026 which returned 7.62 metres of 2.72% Cu, 1.51 g/t Au and 17.90 g/t Ag and a further 4.57 metres of 1.68% Cu, 0.51 g/t Au and 10.30 g/t Ag;

- Hole AZR-027 which returned 42.67 metres of 1.73% Cu, 3.27 g/t Au and 27.30 g/t Ag;

- Hole AZR-030 which returned 13.72 metres of 1.45% Cu, 1.63 g/t Au and 11.00 g/t Ag;

- Hole AZR-032 which returned 13.72 metres of 2.11% Cu, 0.55 g/t Au and 23.40 g/t Ag; and

- Hole AZR-033 which returned 10.67 metres of 1.55% Cu, 0.27 g/t Au and 21.60 g/t Ag.

(i)includes 11.88 metres of open space

Highlights from previous operator drilling include:

- Hole 23975-1 which returned 56.00 metres of 2.19% Cu, 0.66 g/t Au and 24.30 g/t Ag;

- Hole 53450-6 which returned 37.60 metres of 4.63% Cu, 0.41 g/t Au and 46.80 g/t Ag; and

- Hole 53450-11 which returned 34.59 metres of 4.34% Cu, 0.44 g/t Au and 68.70 g/t Ag.

Commenting on these results, Mr. Patrick Downey, President and CEO of Aura Minerals, stated, "These results from the Aranzazu Project continue to confirm the continuity of the high-grade chutes within the main skarn mineralization. The new Calcocita Zone could prove to be very important in our plans to re-start operations.

We plan to follow-up this first batch with more drilling to test the continuity of the Calcocita Zone as this would add significant high-grade tonnes to the resource."



Table 1 - Assays

--------------------------------------------------------------------------
Inter-
Azi- val Cu
muth Dip From To (1) (2) Au Ag
(degr- (degr- (met- (met- (met- (4) (3) (3)
Hole # North East ees) ees) res) res) res) (%) (g/t) (g/t)
--------------------------------------------------------------------------
Aura Minerals Drilling
--------------------------------------------------------------------------
AZR-001 254125 2724027 210 -50 62.48 67.06 4.57 0.94 0.09 7.10
--------------------------------------------------------------------------
AZR-002 254125 2724027 210 -65 85.34 118.87 33.53 0.94 1.72 16.20
--------------------------------------------------------------------------
AZR-003 254104 2724031 202 -64 74.68 121.92 47.24 3.33 4.22 45.50
(ii)
--------------------------------------------------------------------------
AZR-004 254083 2724033 207 -59 56.39 65.53 9.14 0.75 0.66 9.50
--------------------------------------------------------------------------
AZR-004 254083 2724033 207 -59 71.63 74.68 3.05 1.26 2.04 12.20
--------------------------------------------------------------------------
AZR-005 254115 2724057 203 -59 53.34 57.91 4.57 0.80 0.10 17.30
--------------------------------------------------------------------------
AZR-005 254115 2724057 203 -59 105.16 146.30 41.15 1.61 1.96 20.50
--------------------------------------------------------------------------
AZR-006 254115 2724057 209 -65 36.58 45.72 9.14 1.02 0.17 6.10
--------------------------------------------------------------------------
AZR-006 254115 2724057 209 -65 50.29 53.34 3.05 0.61 0.22 11.70
--------------------------------------------------------------------------
AZR-006 254115 2724057 209 -65 105.16 108.20 3.05 0.79 0.27 6.30
--------------------------------------------------------------------------
AZR-007 254284 2723945 207 -43 41.15 45.72 4.57 0.70 0.25 4.80
--------------------------------------------------------------------------
AZR-007 254284 2723945 207 -43 60.96 64.01 3.05 0.51 2.37 10.30
--------------------------------------------------------------------------
AZR-008 254324 2723936 208 -49 48.77 64.01 15.24 0.62 1.28 11.00
--------------------------------------------------------------------------
AZR-009 254472 2724018 208 -43 167.64 188.98 21.34 0.93 0.95 14.90
--------------------------------------------------------------------------
AZR-010 254364 2723985 210 -63 106.68 128.02 21.34 0.97 0.39 16.30
--------------------------------------------------------------------------
AZR-010 254364 2723985 210 -63 138.68 147.83 9.14 0.74 0.66 8.70
--------------------------------------------------------------------------
AZR-010 254364 2723985 210 -63 236.22 271.27 35.05 1.18 0.91 16.30
--------------------------------------------------------------------------
AZR-011 254352 2724008 208 -55 112.78 120.40 7.62 1.10 0.46 15.40
--------------------------------------------------------------------------
AZR-011 254352 2724008 208 -55 143.26 149.35 6.10 0.69 2.28 9.20
--------------------------------------------------------------------------
AZR-011 254352 2724008 208 -55 254.51 269.75 15.20 2.71 1.98 36.10
--------------------------------------------------------------------------
AZR-012 254283 2723987 210 -50 141.73 146.30 4.57 1.02 0.30 12.80
--------------------------------------------------------------------------
AZR-012 254283 2723987 210 -50 166.12 169.16 3.05 0.73 0.35 8.40
--------------------------------------------------------------------------
AZR-013 253923 2724064 205 -56 57.91 80.77 22.86 1.23 0.95 11.30
--------------------------------------------------------------------------
AZR-014 253924 2724064 206 -67 77.72 103.63 25.91 1.60 1.39 22.40
--------------------------------------------------------------------------
AZR-015 254131 2724030 210 -71 22.86 33.53 10.67 0.63 0.12 6.00
--------------------------------------------------------------------------
AZR-015 254131 2724030 210 -71 132.59 201.17 68.58 1.35 1.98 17.60
--------------------------------------------------------------------------
AZR-015 254131 2724030 210 -71 219.46 227.08 7.62 0.58 0.71 7.80
--------------------------------------------------------------------------
AZR-016 253907 2724132 214 -51 106.68 118.87 12.19 1.10 0.39 10.20
--------------------------------------------------------------------------
AZR-016 253907 2724132 214 -51 131.06 137.16 6.10 0.80 0.34 6.40
--------------------------------------------------------------------------
AZR-016 253907 2724132 214 -51 141.73 158.50 16.76 2.88 1.23 28.50
--------------------------------------------------------------------------
AZR-016 253907 2724132 214 -51 166.12 216.41 50.29 1.12 0.70 8.50
--------------------------------------------------------------------------
AZR-016 253907 2724132 214 -51 220.98 224.03 3.05 1.00 0.59 6.00
--------------------------------------------------------------------------
AZR-017 253907 2724132 221 -58 135.64 202.69 67.06 1.03 0.49 6.70
--------------------------------------------------------------------------
AZR-018 254236 2724002 210 -69 39.62 47.24 7.62 0.95 1.86 15.40
--------------------------------------------------------------------------
AZR-018 254236 2724002 210 -69 60.96 70.10 9.14 0.87 0.94 8.30
--------------------------------------------------------------------------
AZR-018 254236 2724002 210 -69 204.22 210.31 6.10 2.36 0.77 34.00
--------------------------------------------------------------------------
AZR-018 254236 2724002 210 -69 216.41 228.60 12.19 2.59 1.90 18.80
--------------------------------------------------------------------------
AZR-020 253882 2724188 214 -62 135.64 146.30 10.67 1.04 0.61 5.70
--------------------------------------------------------------------------
AZR-020 253882 2724188 214 -62 199.64 233.17 33.53 2.88 0.86 22.80
--------------------------------------------------------------------------
AZR-020 253882 2724188 214 -62 182.88 185.93 3.05 0.91 0.48 6.80
--------------------------------------------------------------------------
AZR-021 253883 2724189 214 -65 164.59 190.50 25.91 1.01 0.42 8.40
--------------------------------------------------------------------------
AZR-021 253883 2724189 214 -65 207.26 213.36 6.10 1.05 0.23 8.40
--------------------------------------------------------------------------
AZR-021 253883 2724189 214 -65 234.70 252.98 18.29 2.75 0.83 10.20
--------------------------------------------------------------------------
AZR-022 253878 2724135 212 -64 124.97 134.11 9.14 0.81 0.29 7.10
--------------------------------------------------------------------------
AZR-022 253878 2724135 212 -64 138.68 143.26 4.57 1.01 0.11 7.70
--------------------------------------------------------------------------
AZR-022 253878 2724135 212 -64 152.40 155.45 3.05 0.66 0.07 5.90
--------------------------------------------------------------------------
AZR-022 253878 2724135 212 -64 164.59 195.07 30.48 1.84 0.74 18.50
--------------------------------------------------------------------------
AZR-023 253878 2724135 212 -70 94.49 97.54 3.05 1.18 0.70 10.50
--------------------------------------------------------------------------
AZR-023 253878 2724135 212 -70 138.68 147.83 9.14 2.09 0.79 22.60
--------------------------------------------------------------------------
AZR-023 253878 2724135 212 -70 178.31 192.02 13.72 0.75 0.41 6.20
--------------------------------------------------------------------------
AZR-024 253907 2724133 209 -64 147.83 163.07 15.24 1.01 0.42 10.00
--------------------------------------------------------------------------
AZR-024 253907 2724133 209 -64 169.16 185.93 16.76 2.26 0.38 25.50
--------------------------------------------------------------------------
AZR-025 253865 2724204 206 -50 103.63 114.30 10.67 2.18 1.83 10.80
--------------------------------------------------------------------------
AZR-025 253865 2724204 206 -50 128.02 131.06 3.05 1.13 0.23 9.70
--------------------------------------------------------------------------
AZR-025 253865 2724204 206 -50 163.07 166.12 3.05 1.15 0.21 9.80
--------------------------------------------------------------------------
AZR-025 253865 2724204 206 -50 170.69 173.74 3.05 1.29 0.38 11.80
--------------------------------------------------------------------------
AZR-025 253865 2724204 206 -50 178.31 230.12 51.82 1.29 0.61 9.70
--------------------------------------------------------------------------
AZR-025 253865 2724204 206 -50 240.79 248.41 7.62 1.01 0.41 9.90
--------------------------------------------------------------------------
AZR-025 253865 2724204 206 -50 257.56 265.18 7.62 1.31 0.44 10.50
--------------------------------------------------------------------------
AZR-026 253864 2724203 206 -55 114.30 121.92 7.62 2.72 1.51 17.90
--------------------------------------------------------------------------
AZR-026 253864 2724203 206 -55 204.22 208.79 4.57 1.68 0.51 10.30
--------------------------------------------------------------------------
AZR-027 254153 2724070 204 -65 85.34 91.44 6.10 0.86 0.77 19.70
--------------------------------------------------------------------------
AZR-027 254153 2724070 204 -65 96.01 102.11 6.10 0.50 0.55 4.60
--------------------------------------------------------------------------
AZR-027 254153 2724070 204 -65 179.83 222.50 42.67 1.73 3.27 27.30
--------------------------------------------------------------------------
AZR-028 254095 2724055 207 -59 33.53 39.62 6.10 0.68 0.40 12.80
--------------------------------------------------------------------------
AZR-028 254095 2724055 207 -59 96.01 99.06 3.05 0.63 1.06 8.60
--------------------------------------------------------------------------
AZR-028 254095 2724055 207 -59 105.16 112.78 7.62 1.05 1.06 6.70
--------------------------------------------------------------------------
AZR-028 254095 2724055 207 -59 132.59 137.16 4.57 1.43 0.99 13.00
--------------------------------------------------------------------------
AZR-029 254095 2724056 206 -68 83.82 86.87 3.05 0.59 0.33 9.50
--------------------------------------------------------------------------
AZR-029 254095 2724056 206 -68 108.20 115.82 7.62 0.65 1.03 8.00
--------------------------------------------------------------------------
AZR-030 253987 2724121 205 -44 111.25 124.97 13.72 1.45 1.63 11.00
--------------------------------------------------------------------------
AZR-031 253988 2724122 206 -55 150.88 155.45 4.57 1.67 2.33 18.10
--------------------------------------------------------------------------
AZR-032 253768 2724300 220 -57 184.40 188.98 4.57 0.94 0.16 13.00
--------------------------------------------------------------------------
AZR-032 253768 2724300 220 -57 198.12 213.36 15.24 1.04 0.24 12.30
--------------------------------------------------------------------------
AZR-032 253768 2724300 220 -57 257.56 269.75 12.19 0.96 0.22 6.00
--------------------------------------------------------------------------
AZR-032 253768 2724300 220 -57 303.28 309.37 6.10 0.86 0.08 6.50
--------------------------------------------------------------------------
AZR-032 253768 2724300 220 -57 326.14 339.85 13.72 2.11 0.55 23.40
--------------------------------------------------------------------------
AZR-033 253768 2724300 220 -52 179.83 190.50 10.67 1.55 0.27 21.60
--------------------------------------------------------------------------
UAZ-001 253739 2724104 220 -20 4.50 13.50 9.00 1.31 0.31 7.50
--------------------------------------------------------------------------
UAZ-001 253739 2724104 220 -20 40.50 46.50 6.00 1.19 0.53 7.20
--------------------------------------------------------------------------
UAZ-001 253739 2724104 220 -20 51.00 55.50 4.50 1.14 0.28 5.60
--------------------------------------------------------------------------
UAZ-001 253739 2724104 220 -20 60.00 63.00 3.00 1.19 0.19 6.90
--------------------------------------------------------------------------
UAZ-001 253739 2724104 220 -20 69.00 81.00 12.00 1.29 0.24 6.00
--------------------------------------------------------------------------
UAZ-001 253739 2724104 220 -20 94.50 99.00 4.50 1.94 0.52 12.30
--------------------------------------------------------------------------
UAZ-002 253739 2724104 220 -35 78.00 93.00 15.00 1.24 0.34 7.60
--------------------------------------------------------------------------
UAZ-003 253739 2724105 220 -50 103.50 115.50 12.00 0.98 0.26 10.38
--------------------------------------------------------------------------
UAZ-004 253739 2724105 220 -59 55.50 58.50 3.00 1.03 0.25 8.40
--------------------------------------------------------------------------
UAZ-004 253739 2724105 220 -59 124.50 127.50 3.00 1.22 0.16 9.25
--------------------------------------------------------------------------
UAZ-005 253740 2724104 200 -30 16.50 19.50 3.00 1.07 0.17 6.15
--------------------------------------------------------------------------
UAZ-005 253740 2724104 200 -30 55.50 63.09 7.59 1.64 0.33 8.82
--------------------------------------------------------------------------
UAZ-007 253740 2724105 200 -60 16.50 19.50 3.00 0.53 0.17 3.65
--------------------------------------------------------------------------
UAZ-008 253745 2724108 100 0 13.50 16.50 3.00 0.74 0.19 7.80
--------------------------------------------------------------------------
UAZ-008 253745 2724108 100 0 58.50 61.50 3.00 0.88 0.26 5.75
--------------------------------------------------------------------------
UAZ-009 253745 2724108 100 25 10.50 15.00 4.50 1.49 0.48 8.70
--------------------------------------------------------------------------
UAZ-009 253745 2724108 100 25 67.50 88.50 21.00 7.57 1.47 38.70
--------------------------------------------------------------------------
UAZ-010 253745 2724108 100 -25 58.50 63.00 4.50 1.18 0.36 10.83
--------------------------------------------------------------------------
UAZ-010 253745 2724108 100 -25 67.50 75.00 7.50 1.50 0.36 9.68
--------------------------------------------------------------------------
UAZ-010 253745 2724108 100 -25 103.50 119.32 15.82 2.92 1.37 33.66
--------------------------------------------------------------------------
UAZ-012 253745 2724110 70 -30 67.50 75.00 7.50 1.08 0.65 3.98
--------------------------------------------------------------------------
UAZ-014 253743 2724111 40 -25 58.50 73.50 15.00 1.28 0.48 20.70
--------------------------------------------------------------------------
UAZ-015 253745 2724108 100 -42 114.00 117.00 3.00 0.55 0.08 5.30
--------------------------------------------------------------------------
UAZ-015 253745 2724108 100 -42 127.50 144.00 16.50 2.00 0.51 18.62
--------------------------------------------------------------------------
Previous Operators Drilling
--------------------------------------------------------------------------
23300 254589 2723291 0 -90 106.07 110.00 3.93 1.72 0.79 41.10
-3
--------------------------------------------------------------------------
23975 254579 2723954 270 -70 380.00 436.00 56.00 2.19 0.66 24.30
-1
--------------------------------------------------------------------------
23975 254579 2723954 270 -70 468.00 472.00 4.00 0.59 0.20 10.70
-1
--------------------------------------------------------------------------
53450 253468 2724372 70 -90 0.00 37.60 37.60 4.63 0.41 46.80
-6
--------------------------------------------------------------------------
53450 253468 2724372 70 -70 0.00 10.00 10.00 2.79 0.24 26.10
-7
--------------------------------------------------------------------------
53450 253468 2724372 70 -80 0.00 36.00 36.00 3.71 0.52 58.20
-8
--------------------------------------------------------------------------
53450 253468 2724372 60 -45 0.00 6.00 6.00 4.38 0.29 43.20
-10
--------------------------------------------------------------------------
53450 253468 2724372 70 -70 0.00 34.59 34.59 4.34 0.44 68.70
-11
--------------------------------------------------------------------------
53750 253746 2724227 180 -65 298.00 302.00 4.00 1.17 0.28 8.90
-3
--------------------------------------------------------------------------
53750 253746 2724227 180 -65 364.00 370.00 6.00 1.18 0.19 6.50
-3
--------------------------------------------------------------------------
54200 254202 2723947 0 -90 24.00 28.00 4.00 0.61 0.17 2.60
-5
--------------------------------------------------------------------------
54625 254618 2724022 225 -65 350.52 360.00 9.48 1.55 0.91 41.40
-3
--------------------------------------------------------------------------
54625 254618 2724022 225 -65 368.00 372.00 4.00 2.13 1.21 27.20
-3
--------------------------------------------------------------------------
54650 254637 2723707 225 -80 186.00 206.00 20.00 0.82 0.79 9.30
-9
--------------------------------------------------------------------------

(1) true width has yet to be determined
(2) using a copper cutoff grade 0.5%
(3) fire assay and atomic absorption finish
(4) atomic absorption
(ii) interval includes 11.88 metres of open space


National Instrument 43-101 ("NI 43-101") Disclosure

Prior to the acquisition of the Project by Aura Minerals, Dr. Greg Meyers, who is a Qualified Person as defined by NI 43-101, supervised all exploration activities during the 2007/08 drilling campaign. Core samples were logged, photographed and half split for assaying. Assays were completed at the Inspectorate Laboratory in Reno, Nevada, with all sample preparation completed at the Inspectorate facility in Durango, Mexico. Selected pulps were sent to ALS Chemex in Vancouver, Canada for check assays.

All of these procedures and the data has been reviewed by Mr. Anthony P. George, B.Sc.(Hons), P.Eng., who is the Company's Qualified Person as defined by NI 43-101. Mr. George has also reviewed and approved the contents of this news release as applicable.

About Aura Minerals Inc.

Aura Minerals is a Canadian resource company focused on the acquisition, exploration and development of mining properties in the Americas. In addition to the Company's Aranzazu copper mine in Mexico, the Company owns the advanced stage Arapiraca Project in north-eastern Brazil, which was originally explored in the 1980's and 1990's for copper and gold and includes the Serrote Deposit. The project also contains magnetite (up to 50%) and nickel and the Company plans to evaluate the Arapiraca Project for all four metals which can be readily extracted. The nearby infrastructure is excellent with ready access to electricity, water and shipping ports.

Cautionary Statement:

This news release contains forward-looking statements that are not historical facts. Forward-looking statements involve risks, uncertainties and other factors that could cause actual results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking statements. Factors that could cause actual results to differ materially from these forward-looking statements include those risks set out in Aura Minerals' public documents filed on SEDAR at www.sedar.com. Although Aura Minerals believes that the assumptions and factors used in preparing the forward-looking statements are reasonable, undue reliance should not be placed on these statements, which only apply as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. Aura Minerals disclaims any intention or obligation to update or revise any forward-looking statement, whether as a result of new information, future events or otherwise.

No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein.

Contact Information