Capstone Infrastructure Responds to CMA Provisional Findings for Bristol Water


TORONTO, ONTARIO--(Marketwired - July 10, 2015) - Capstone Infrastructure Corporation (TSX:CSE)(TSX:CSE.DB.A)(TSX:CSE.PR.A)(TSX:CPW.DB) (the "Corporation") today received provisional findings from the UK Competition and Markets Authority (CMA) related to its review of Bristol Water's 2015 to 2020 asset management plan as determined last December by Ofwat, the economic regulator for the UK water sector.

Based on Capstone's preliminary analysis of the provisional findings, the CMA panel finds Bristol Water's submissions to be persuasive in certain key areas. The CMA has provisionally granted Bristol Water £20 million higher total expenditure over the 2015 to 2020 AMP6 period, while simultaneously reducing the scope of required projects under Ofwat's determination. Further, the potential exists for an additional £20 million allowance for enhancements to water treatment works. Based on the provisional allowance, the CMA has set total expenditures of £429 million over AMP6.

The CMA also provisionally raised the allowable weighted average cost of capital by a modest amount to 3.65%. This reflects a recognition of a portion of Bristol Water's embedded debt costs as well as a higher equity return, but also takes into account the low current interest rates.

Capstone will work closely with Bristol Water management over the next ten working days to prepare a compelling case that responds to areas in which the CMA could refine its provisional decision in order to arrive at a final determination that will best serve the company's customers, protect the integrity of the system and place Bristol Water on a more equal footing to its peers in the UK.

Regardless of the final outcome of the CMA review, Capstone reiterates support for its current dividend policy for shareholders.

The CMA process from this stage to the final determination involves further main party hearings on August 4. The final deadline for representations is August 7, 2015, and the CMA will send its final determination in this matter to Ofwat by September 3, 2015. Capstone will continue its joint effort with Bristol Water throughout and until the conclusion of the process to ensure the end result is a fair outcome.

More information about the CMA, its process and documents related to this review can be accessed here: https://www.gov.uk/cma-cases/bristol-water-plc-price-determination.

About Capstone

Capstone's mission is to provide investors with an attractive total return from responsibly managed long-term investments in core infrastructure in Canada and internationally. The company's strategy is to develop, acquire and manage a portfolio of high quality utilities, power and transportation businesses, and public-private partnerships that operate in a regulated or contractually-defined environment and generate stable cash flow. Capstone currently has investments in utilities businesses in Europe and owns, operates and develops thermal and renewable power generation facilities in Canada with a total installed capacity of net 466 megawatts. Please visit www.capstoneinfrastructure.com for more information.

Notice to Readers

Certain of the statements contained within this document are forward-looking and reflect management's expectations regarding the future growth, results of operations, performance and business of Capstone Infrastructure Corporation (the "Corporation") based on information currently available to the Corporation. Forward-looking statements and financial outlook are provided for the purpose of presenting information about management's current expectations and plans relating to the future and readers are cautioned that such statements may not be appropriate for other purposes. These statements and financial outlook use forward-looking words, such as "anticipate", "continue", "could", "expect", "may", "will", "intend", "estimate", "plan", "believe" or other similar words. These statements and financial outlook are subject to known and unknown risks and uncertainties that may cause actual results or events to differ materially from those expressed or implied by such statements and financial outlook and, accordingly, should not be read as guarantees of future performance or results. The forward-looking statements and financial outlook within this document are based on information currently available and what the Corporation currently believes are reasonable assumptions, including the material assumptions set out in the management's discussion and analysis of the results of operations and the financial condition of the Corporation ("MD&A") for the year ended December 31, 2014 under the heading "Results of Operations", as updated in subsequently filed MD&A of the Corporation (such documents are available under the Corporation's SEDAR profile at www.sedar.com).

Other potential material factors or assumptions that were applied in formulating the forward-looking statements and financial outlook contained herein include or relate to the following: that the business and economic conditions affecting the Corporation's operations will continue substantially in their current state, including, with respect to industry conditions, general levels of economic activity, regulations, weather, taxes and interest rates; that there will be no material delays in the Corporation's wind development projects achieving commercial operation; that the Corporation's power infrastructure facilities will experience normal wind, hydrological and solar irradiation conditions, and ambient temperature and humidity levels; that there will be no material changes to the Corporation's facilities, equipment or contractual arrangements; that there will be no material changes in the legislative, regulatory and operating framework for the Corporation's businesses; that there will be no material delays in obtaining required approvals for the Corporation's power infrastructure facilities, or Värmevärden; that there will be no material changes in rate orders or rate structures for Bristol Water; that Bristol Water will implement rates prescribed in Ofwat's final determination while pursuing a more appropriate outcome through the Competition & Markets Authority; that there will be no material changes in environmental regulations for the power infrastructure facilities, Värmevärden or Bristol Water;
that there will be no significant event occurring outside the ordinary course of the Corporation's businesses; the refinancing on similar terms of the Corporation's and its subsidiaries' various outstanding credit facilities and debt instruments which mature during the period in which the forward-looking statements and financial outlook relate; market prices for electricity in Ontario and the amount of hours Cardinal is dispatched; the price Whitecourt will receive for its electricity production considering the market price for electricity in Alberta, the impact of renewable energy credits, and Whitecourt's agreement with Millar Western, which includes sharing mechanisms regarding the price received for electricity sold by the facility; the re-contracting of the PPA for the Sechelt; that there will be no material change from the expected amount and timing of capital expenditures by Bristol Water; that there will be no material changes to the Swedish Krona to Canadian dollar and UK pound sterling to Canadian dollar exchange rates; and that Bristol Water will operate and perform in a manner consistent with the regulatory assumptions underlying AMP5 and management's assumptions of the final regulatory outcome for AMP6, including, among others: real and inflationary changes in Bristol Water's revenue, Bristol Water's expenses changing in line with inflation and efficiency measures, and capital investment, leakage, customer service standards and asset serviceability targets being achieved.

Although the Corporation believes that it has a reasonable basis for the expectations reflected in these forward-looking statements and financial outlook, actual results may differ from those suggested by the forward-looking statements and financial outlook for various reasons, including: risks related to the Corporation's securities (dividends on common shares and preferred shares are not guaranteed; volatile market price for the Corporation's securities; shareholder dilution; and convertible debentures credit risk, subordination and absence of covenant protection); risks related to the Corporation and its businesses (availability of debt and equity financing; default under credit agreements and debt instruments; geographic concentration; foreign currency exchange rates; acquisitions, development and integration; environmental, health and safety; changes in legislation and administrative policy; and reliance on key personnel); risks related to the Corporation's power infrastructure facilities (power purchase agreements; completion of the Corporation's wind development projects; operational performance; contract performance and reliance on suppliers; land tenure and related rights; environmental; and regulatory environment); risks related to Värmevärden (operational performance; fuel costs and availability; industrial and residential contracts; environmental; regulatory environment; and labour relations); and risks related to Bristol Water (Ofwat price determinations; failure to deliver capital investment programs; economic conditions; operational performance; failure to deliver water leakage target; SIM and the serviceability assessment; pension plan obligations; regulatory environment; competition; seasonality and climate change; and labour relations). For a comprehensive description of these risk factors, please refer to the "Risk Factors" section of the Corporation's annual information form dated March 24, 2015, as supplemented by disclosure of risk factors contained in any subsequent annual information form, material change reports (except confidential material changes reports), business acquisition reports, interim financial statements, interim MD&A and information circulars filed by the Corporation with the securities commissions or similar authorities in Canada (which are available under the Corporation's SEDAR profile at www.sedar.com).

The assumptions, risks and uncertainties described above are not exhaustive and other events and risk factors could cause actual results to differ materially from the results and events discussed in the forward-looking statements and financial outlook. The forward-looking statements and financial outlook within this document reflect current expectations of the Corporation as at the date of this document and speak only as at the date of this document. Except as may be required by applicable law, the Corporation does not undertake any obligation to publicly update or revise any forward-looking statements and financial outlook.

This document is not an offer or invitation for the subscription or purchase of or a recommendation of securities. It does not take into account the investment objectives, financial situation and particular needs of any investors. Before making an investment in the Corporation, an investor or prospective investor should consider whether such an investment is appropriate to their particular investment needs, objectives and financial circumstances and consult an investment adviser if necessary.

Contact Information:

Capstone Infrastructure Corporation
Aaron Boles
Senior Vice President, Communications and Investor Relations
(416) 649-1325
aboles@capstoneinfra.com