MONTREAL, QUEBEC--(CCNMatthews - Nov. 2, 2006) - Dia Bras Exploration Inc. (TSX VENTURE:DIB) ("Dia Bras" and or the "Company) is pleased to announce an intersection of 38 meters grading 188 g/t Ag as part of the latest exploration results from its Cusi silver Project in Chihuahua State, Mexico.

Hole DC06B030 drilled to test the La Bamba open pit cut from 35 m to 78 m, a mineralized breccia of 38 metres grading 0.10 g/t Au, 188.48 g/t Ag, 0.02 % Cu, 0.28 % Pb and 0.14 % Zn. Included in this interval are a section of 7 meters at 390 g/t Ag and a one-meter section at 981 g/t Ag.

La Bamba and San Miguel are inactive mines that are optioned from Pershimco Resources, whereby Dia Bras can earn 70% interest (see news release dated May 31, 2006).

La Bamba is an open cut that follows a northeastern trending 30-meter thick breccia structure with a steep southeastern dip. The pit measures 100 meters long by an average of 20 meters wide and up to 30 meters deep. The structure, which includes La Bamba and San Miguel, has a known strike length of 600 meters. This mineralized structure has been mapped by Andre Ciesielski, Ph.D., and identified for an additional 1000 meters onto the Dia Bras 100% owned land package.

The following drill holes have been collared to test the extension on strike and at depth of the breccia. One drill is on site and a second one will be mobilized to accelerate the evaluation.



-----------------------------------------------------------------
-----------------------------------------------------------------
Au Ag Cu Pb Zn
Drill Hole From To Width g/t g/t (%) (%) (%)
-----------------------------------------------------------------
-----------------------------------------------------------------
LA BAMBA ZONE
-----------------------------------------------------------------
-----------------------------------------------------------------
DC06B30 35.00 73.00 38.00 0.10 188 0.02 0.28 0.14
-----------------------------------------------------------------
including 52.00 59.00 7.00 0.25 390 0.04 0.67 0.23
-----------------------------------------------------------------
including 39.00 40.00 1.00 0.73 981 0.04 1.09 0.11
-----------------------------------------------------------------
-----------------------------------------------------------------
DC06B32 Results are pending
-----------------------------------------------------------------
DC06B34 31.15 37.52 6.37 0.13 165 0.03 0.25 0.08
-----------------------------------------------------------------
including 35.52 36.52 1.00 0.33 381 0.04 0.14 0.07
-----------------------------------------------------------------
-----------------------------------------------------------------
DC06B36 41.15 63.65 22.50 0.07 113 0.01 0.05 0.08
-----------------------------------------------------------------
including 57.65 62.65 5.00 0.18 277 0.02 0.13 0.11
-----------------------------------------------------------------
-----------------------------------------------------------------
DC06B37 57.30 67.00 9.70 - 110 0.04 0.05 0.06
-----------------------------------------------------------------
including 64.00 65.00 1.00 - 370 0.05 0.14 0.07
-----------------------------------------------------------------
-----------------------------------------------------------------
DC06B40 38.00 41.00 3.00 - 153 0.01 0.12 0.09
-----------------------------------------------------------------
-----------------------------------------------------------------
DC06B42 69.50 80.00 10.50 - 194 0.16 0.03 0.15
-----------------------------------------------------------------
-----------------------------------------------------------------

Two additional drill holes were drilled at San Miguel to test
material easily accessible from the shaft with the following
results:

-----------------------------------------------------------------
-----------------------------------------------------------------
Au Ag Cu Pb Zn
Drill Hole From To Width g/t g/t (%) (%) (%)
-----------------------------------------------------------------
-----------------------------------------------------------------
SAN MIGUEL ZONE
-----------------------------------------------------------------
-----------------------------------------------------------------
10 meters -- North of the shaft
-----------------------------------------------------------------
-----------------------------------------------------------------
DC06B26 44.00 50.00 6.00 0.07 92 0.03 0.75 0.24
-----------------------------------------------------------------
including 44.00 45.00 1.00 0.14 199 0.09 0.65 0.58
-----------------------------------------------------------------
including 48.00 49.00 1.00 0.20 253 0.03 3.02 0.43
-----------------------------------------------------------------
-----------------------------------------------------------------
and 75.00 79.00 4.00 0.05 121 0.02 0.10 0.10
-----------------------------------------------------------------
including 75.00 76.00 1.00 0.06 148 0.02 0.14 0.07
-----------------------------------------------------------------
including 78.00 79.00 1.00 0.04 139 0.03 0.09 0.11
-----------------------------------------------------------------
-----------------------------------------------------------------
and 89.00 90.00 1.00 0.05 111 0.02 0.05 0.07
-----------------------------------------------------------------
-----------------------------------------------------------------
and 93.00 96.00 3.00 0.08 116 0.03 0.11 0.12
-----------------------------------------------------------------
including 95.00 96.00 1.00 0.14 198 0.05 0.16 0.19
-----------------------------------------------------------------
-----------------------------------------------------------------
10 meters -- South of the shaft
-----------------------------------------------------------------
-----------------------------------------------------------------
DC06B27 87.00 88.00 1.00 0.02 28 0.01 0.27 1.18
-----------------------------------------------------------------
and 93.00 94.00 1.00 0.03 226 0.04 0.25 0.71
-----------------------------------------------------------------
-----------------------------------------------------------------


Although the program has only been in progress for five months, significant silver values have been identified and material from various portions of the inactive mines will be processed at the Company's Malpaso mill beginning in November 2006. These early results support the interpretation that significant silver mineralization remains to be mined in the district.

The Company commissioned an independent 43-101 technical report to Scott Wilson Roscoe Postel, expected to be completed by the end of the year.

Mr. Andre St-Michel, engineer and Executive Vice-President of Dia Bras, is the qualified person within the meaning of NI43-101.

Method of analysis

All drill samples were assayed by ALS Chemex, North Vancouver, Canada with the exception of the samples from hole DC06B40 and 42 that were assayed at ERSA Global Laboratory at their facilities in Torreon, Mexico, using the using ICP method, and hole DC06B37 that was analysed by atomic absorption at the Company's Malpaso lab.

To view a map of the San Miguel & La Bamba Area Longitudinal View NW 65 degrees please click on the link below:

http://www.ccnmatthews.com/docs/lngview.pdf

To view a map of the San Miguel & La Bamba Area Surface Plan please click on the link below:

http://www.ccnmatthews.com/docs/surfcpln.pdf

About Dia Bras

Dia Bras is a Canadian exploration mining company focused on precious and base metals in the State of Chihuahua, in northern Mexico. The Company is committed to developing and adding value to its assets - the Bolivar copper-zinc project and the newly acquired Cusi silver mining camp. The Company trades on the TSX Venture Exchange, under the symbol "DIB".

If you would like to receive press releases via email please contact info@diabras.com Please specify "Dia Bras press releases" in the subject line.

Forward-looking statements: Except for statements of historical fact, all statements in this news release, without limitation, regarding new projects, acquisitions, future plans and objectives are forward-looking statements that involve risks and uncertainties. There can be no assurance that such statements will prove to be accurate; actual results and future events could differ materially from those anticipated in such statements.

The TSX Venture Exchange does not accept responsibility for the adequacy or accuracy of this press release.

Contact Information

  • Dia Bras Exploration Inc.
    Thomas L. Robyn
    Execuvtive Chairman
    514-393-8875 ext. 241
    or
    Dia Bras Exploration Inc.
    Rejean Gosselin
    President
    514-393-8875 ext. 241
    or
    Sun International Communications
    Nicole Blanchard
    Managing Partner
    450-627-6600