Highbank Resources Ltd.
TSX VENTURE : HBK

Highbank Resources Ltd.

July 13, 2005 13:17 ET

Highbank Resources Ltd.: Portland Canal-Swamp Point North, Project Update

VANCOUVER, BRITISH COLUMBIA--(CCNMatthews - July 13, 2005) - Highbank Resources Ltd. ("HBK") (TSX VENTURE:HBK) is pleased to report the completion of the first stage of its Phase 1 work program.

This program consisted of taking approx. 12,000 lbs. of sample material from test pits over 20 ft. deep. The material was then shipped to Levelton Engineering of Richmond, who will perform the necessary test in accordance with the recognized Canadian Standards Association ("CSA") and American Society for Testing and Materials ("ASTM") standards for the evaluation of construction aggregates both in Canada and in the United States.

These results will be evaluated by Wardrop Engineering as part of the feasibility study.

ON BEHALF OF THE BOARD OF DIRECTORS

Jake Bottay, President/Director


The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this news release.

Contact Information