Integra Gold Intersects 95.86 g/t Gold Over 2.0 Meters and 11.24 g/t Gold Over 9.0 Meters, Confirms Continuity of High-Grade Vein 7 at Parallel Zone


VANCOUVER, BRITISH COLUMBIA--(Marketwired - Feb. 11, 2014) - Integra Gold Corp. (TSX VENTURE:ICG)

Press Release Highlights:

  • Continuity of high grade zones within block model confirmed
  • Drill program at 25-35 meter ("m") centers completed at Parallel Zone
  • Assays pending for second portion of drill program
  • Other significant intersections include:
    • PV-13-03 with 13.06 grams/tonne gold ("g/t Au") over 2.00 m
    • PV-13-07 with 41.83 g/t Au over 1.10 m
    • PV-13-09 with 71.47 g/t Au over 1.00 m
    • PV-13-16 with 7.67 g/t Au over 6.00 m
    • PV-13-18 with 15.26 g/t Au over 1.00 m
    • PV-13-19 with 15.72 g/t Au over 1.00 m
    • PV-13-20 with 23.66 g/t Au over 4.00 m

Integra Gold Corp. (TSX VENTURE:ICG) ("Integra" or the "Company") is pleased to announce initial results from its fall/winter 2013 Parallel zone drill program at the Lamaque Gold Project located in Val-d'Or, Québec. The Company recently completed 12,589 m in 40 drill holes on the Parallel Zone which is located in the northern part of the Lamaque Project. Results announced today are from the first 20 holes, accounting for 8,050 m of the Parallel Zone program.

"While a resources estimate updated with new data has not yet been completed, a preliminary interpretation has confirmed continuity of mineralization within zones which previously had only widely spaced drill holes," commented Company President and CEO, Stephen de Jong. "This is especially significant for the Parallel Zone as there are a number of very high-grade resource blocks which had not had sufficient drilling completed for the resources to be classified as indicated. Mineralization continuity is crucial in these type of deposits in order to develop a successful mine plan. We are more than encouraged by both the continuation of the geological structure and the high grades intercepted throughout this program. Core samples from the balance of the 40-hole, 12,600 meter program at Parallel are being processed currently, after which an updated resource estimate will be commissioned."

Drill result highlights include:

Drill Hole From
(m)
To
(m)
Interval
(m)
Gold
Assay (g/t)*
PV-13-01 510.00
588.00
512.00
589.00
2.00
1.00
7.45
9.41
PV-13-02 145.00
484.50
148.00
485.50
3.00
1.00
5.33
11.14
PV-13-03 148.00 150.00 2.00 13.06
PV-13-05 187.50 189.50 2.00 95.86
PV-13-07 304.70
373.00
305.80
375.00
1.10
2.00
41.83
5.44
PV-13-08 448.00 450.00 2.00 4.40
PV-13-09 24.00
145.00
158.00
25.00
146.00
159.00
1.00
1.00
1.00
5.59
71.47
9.61
PV-13-10 181.00 182.00 1.00 8.85
PV-13-11 157.00 166.00 9.00 11.24
PV-13-15 114.00
138.00
116.00
139.00
2.00
1.00
6.35
6.90
PV-13-16 182.00 188.00 6.00 7.67
PV-13-18 165.00 166.00 1.00 15.26
PV-13-19 192.00 193.00 1.00 15.72
PV-13-20 166.00
228.00
239.00
167.00
229.00
243.00
1.00
1.00
4.00
17.41
13.16
23.66
* Down-hole thickness, true width varies depending on drill hole dip, most holes are set to intersect vein structures perpendicularly
** 1.00 g/t Au cutoff - individual assay values uncut - no minimum thickness

To view a complete table of composited assay results of recent drilling please click on the following link:

http://www.integragold.com/i/pdf/2013-Parallel-Drill-Hole-Composites_v2.pdf

Parallel Definition Drilling Program

The fall/winter 2013 program at Parallel focused on reducing the drill spacing to 25-35 m centers for the upper portion of the deposit, above the 300 m vertical threshold. Drill holes had been previously been spaced approximately 50 to 75 meters apart. The objective of the program was to transfer inferred resources into the indicated category and to confirm mineralization continuity between existing holes. Interpretation and remodelling is ongoing but preliminary indications are that mineralization is continuous between previous drill holes as well as with a number of the high grade intercepts reported.

The first 12 holes of the campaign also aimed to confirm the lateral extent of the lowermost zone, Vein 7, which had previously been drilled at greater than 75 m intervals and reported as a high-grade, inferred resource. Results including 11.14 g/t Au over 1.0 m in hole PV-13-02 and 5.44 g/t Au over 2.0 m in hole PV-13-07, demonstrate that Zone 7 is likely continuous laterally. Although the mineralized structure has been intersected, further drilling may be required to determine the average grade of that zone due to the high variance in assays between drill holes.

The majority of the holes disclosed today intersected mineralization where it was predicted to occur providing further confidence in the Company's geological model. The most significant and high grade intervals came from Zone 6 which appears to be the most continuous zone at Parallel.

2014 Lamaque Drill Program

Planned drilling for 2014 at the Lamaque project has been set at a minimum of 40,000 m which includes a 20,000 meter definition program at the Triangle Zone, definition drilling at the Fortune Zone, and exploration drilling at Plug No. 5 and Mine No. 3.

A total of 4,660 m in 12 holes have been completed at the Triangle Zone as of January 31, 2014, with no assay results available to date.

Project and Company Profile

Integra's Lamaque gold project is located in the heart of the Val-d'Or gold camp in the Province of Québec, Canada, approximately 550 km northwest of Montréal. Québec is rated one of the best mining jurisdictions in the world. Infrastructure, human resources and mining expertise are readily available.

The Company's primary objective is to continue to prove up additional resources while advancing the existing resource towards production. The project is divided into three main clusters of mineralization, the North, South and West Cluster. The North Cluster consists of the Parallel, Fortune, No. 5 Plug, and No. 3 Mine zones and is located approximately 1 km northwest from the South Cluster, which includes the No. 4 Plug, Triangle and Triangle South zones. The Sixteen Zone and No. 6 Vein form the West Cluster.

Qualified Person

The Lamaque exploration project is under the direct supervision of Hervé Thiboutot, Eng. and Senior Vice-President of the company, and Francois Chabot, Eng. and Operations and Engineering Manager of the Company, both Qualified Person ("QP") as defined by National Instrument 43-101, and Alain-Jean Beauregard, P.Geo., and Daniel Gaudreault, Eng., Geo. of Géologica Inc., both independent QP as defined by National Instrument 43-101. The Company's QPs have reviewed the technical content of this release.

Quality Assurance - Quality Control ("QA/QC")

Thorough QA/QC protocols are followed on the project including insertion of duplicate, blank and standard samples in all drill holes. The core samples are submitted directly to ALS Laboratory Group and Bourlamaque Labs in Val-d'Or for preparation and analysis. Analysis is conducted on 1 assay-ton aliquots. Analysis of Au is performed using fire assay method with atomic absorption finish, with a gravimetric finish completed for samples exceeding 5 g/t Au, or a metallic sieve assay for samples containing visible gold. When available the gravimetric or metallic sieve assay results are used for the reported composite intervals.

ON BEHALF OF THE BOARD OF DIRECTORS

Stephen de Jong, CEO & President

Follow Integra Gold on Twitter: http://twitter.com/integragoldcorp

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

Cautionary Note Regarding Forward-Looking Statements: Certain disclosures in this release constitute forward-looking statements. In making the forward-looking statements in this release, the Company has applied certain factors and assumptions that are based on the Company's current beliefs as well as assumptions made by and information currently available to the Company, including that the Company is able to obtain any government or other regulatory approvals required to complete the private placement and Company's planned exploration activities, that the Company is able to complete the private placement, that the Company is able to procure personnel, equipment and supplies required for its exploration activities in sufficient quantities and on a timely basis and that actual results of exploration activities are consistent with management's expectations. Although the Company considers these assumptions to be reasonable based on information currently available to it, they may prove to be incorrect, and the forward-looking statements in this release are subject to numerous risks, uncertainties and other factors that may cause future results to differ materially from those expressed or implied in such forward-looking statements. Such risk factors include, among others, that the private placement will not be completed, that actual results of the Company's exploration activities will be different than those expected by management and that the Company will be unable to obtain or will experience delays in obtaining any required government approvals or be unable to procure required equipment and supplies in sufficient quantities and on a timely basis. Readers are cautioned not to place undue reliance on forward-looking statements. The Company does not intend, and expressly disclaims any intention or obligation to, update or revise any forward-looking statements whether as a result of new information, future events or otherwise, except as required by law.

Contact Information:

Integra Gold Corp.
Chris Gordon
Corporate Inquiries
chris@integragold.com
www.integragold.com
Twitter: http://twitter.com/integragoldcorp