Komet Resources Inc.: First Results of the VAT Leaching Pilot Tests


QUÉBEC CITY, QUÉBEC--(Marketwired - May 25, 2015) - Komet Resources Inc. (TSX VENTURE:KMT) ("Komet" or the "Company") announces the first results from the VAT Leaching pilot tests.

Started back in January, pilot testing was undertaken as part of a complete and meticulous assessment of onsite ore processing equipment. The leaching process was completely upgraded and modified to use a percolation (Up Flow) system instead of a flooding (down flow) system. These pilot tests will carry on through the next couple of months and will seek to optimize this new process by systematically varying parameters such as debit, granulometry, gold grade of treated material and elution performance.

Testing was conducted using the waste material available on site (see January 29th, 2015 press release). So far, treated material graded an average of 1.75 g/t AU and recovery rates obtained from leaching averaged 66% with a cash cost of 340 CAD/oz (see table below). Three gold elution were made resulting in 1,9 kg of gold (weighted average of 20.07 carats or 84%) and generating a revenue of 75 809 CAD. President and CEO André Gagné declares: "With those surprising and encouraging results and the the gravimetry circuit pilot tests beginning next July, our slogan Produce to discover... takes on its full meaning." All the results are based on the analysis from the laboratory of SGS at Ouagadougou using fire assay followed by atomic absorption spectrometry.

VAT Leaching operating costs - pilot tests
Cost per VAT
Quantity Unit price (XOF) Unit price (CAD) Total (XOF) Total (CAD)
Chemical reactives Tons per VAT 39
Cyanide (kg) 15.625 4 550 9.52 $ 71 094 148.73 $ Waste processed grade (g/t) 1.75
Caustic Soda (kg) 9.375 490 1.03 $ 4 594 9.61 $ Gold per VAT (g) 68.25
Carbon (kg) 3.611 1 500 3.14 $ 5 417 11.33 $ Recovery grade 66%
Assay Recovered gold per VAT (g) 45.045 CAD
Ore 2 7 500 15.69 $ 15 000 31.38 $ Gold price (XOF/g) 22 814 47.73 $
Carbon (kg) 0.75 15 000 31.38 $ 11 250 23.54 $ 1 VAT value (XOF) 1 027 659 2 149.91 $
Diesel
322 excavator ($/day) 0.5 11 700 24.48 $ 5 850 12.24 $ Operating cost (XOF) 231 014 483.29 $
Loader ($/day) 0.5 8 450 17.68 $ 4 225 8.84 $ Gold price (XOF/g) 22 814 47.73 $
322 emptying ($/day) 1 11 700 24.48 $ 11 700 24.48 $ Gold (g) equivalent 10.13
Dump truck ($/day) 1 2 600 5.44 $ 2 600 5.44 $ Recovery grade 66%
Labor (hour) Gold needed 15.34
Security 3.50 563 1.18 $ 1 969 4.12 $ Tons for 1 VAT 39
Excavator operator 3 563 1.18 $ 1 688 3.53 $ Minimum grade (g/t) 0.39
Loader operator 1 563 1.18 $ 563 1.18 $
Truck operator 2 563 1.18 $ 1 125 2.35 $ Cost/oz (CFA) 159 515
Laborer loading 14 563 1.18 $ 7 875 16.47 $ Cost/oz (CAD) 340.12 $
Laborer emptying 14 563 1.18 $ 7 875 16.47 $
Water and electricity Gold price (CAD/Oz)* 1 513.00 $
Water ($/liters) 46.375 30 0.06 $ 1 391 2.91 $ Grams for 1 oz 31.1035
Electricity ($/Kwh) 960 80 0.17 $ 76 800 160.67 $ Exchange CAD to XOF* 469
Total cash cost/VAT 231 014 483.29 $ Gold price (XOF/Oz) 709 597

* Exchange rate is the average for quarter 1, 2015 according to Oanda and gold price is the average price for quarter 1. 2015 according to london metal exchange

Jacques Marchand, P.Eng. Geo., is the Qualified Person who has reviewed this news release and is responsible for the geological information presented there.

More information about the corporation is available at: http://kometgold.com

Forward-Looking Statements

Neither TSX Venture Exchange nor the regulatory service provider (as the term is defined in TSX Venture Exchange's policies) accepts any liability of any kind as to the authenticity or accuracy of this release. - This press release contains statements that may constitute "forward-looking information" or "forward-looking statements" as set out within the context of security law. This forward-looking information is subject to many risks and uncertainties, some of which are beyond Komet Inc.'s ("Komet") control. The actual results or conclusions may differ considerably from those that have been set out, or intimated, in this forward-looking information. There are many factors which may cause such disparity, especially the instability of metal market prices, the results of fluctuations in foreign currency exchange rates or in interest rates, poorly estimated reserves, environmental risks (stricter regulations), unforeseen geological situations, unfavorable extraction conditions, political risks brought on by mining in developing countries, regulatory and governmental policy changes (laws and policies), failure to obtain the requisite permits and approvals from government bodies, or any other risk relating to mining and development. There is no guarantee that the circumstances anticipated in this forward-looking information will occur, or if they do occur, how they will benefit Komet. The forward-looking information is based on the estimates and opinions of Komet's management at the time of the publication of the information and Komet does not assume any obligation to make public updates or modifications to any of the forward-looking statements, whether as a result of new information, future events, or any other cause, except if it is required by securities laws.

Outstanding stocks: 43,272,510

Contact Information:

Investor relations and information:
Andre Gagne, President and CEO
581-300-1666
a.gagne@kometgold.com