SOURCE: Industrial Info Resources

September 17, 2008 08:30 ET

Rehabilitation Program at 700-Megawatt Rifaa Power Station Enters Final Stage, an Industrial Info News Alert

CORDOBA, ARGENTINA--(Marketwire - September 17, 2008) - Researched by Industrial Info Resources (Sugar Land, Texas) -- Bahrain's Ministry of Water and Electricity (MWE) announced that the rehabilitation of the last two of six Alstom (EPA:ALO) (Levallois-Perret, France) GT13D2 75-megawatt (MW) gas turbines at the 700-MW Rifaa Power Station will start in October. This is the second phase of a major rehabilitation program for the Rifaa Power Plant, which has an installed capacity that includes five 50-MW Siemens (Munich, Germany) gas turbines in addition to the six 75-MW Alstom gas turbines. The first phase of the project ended in 2002 and consisted of the rehabilitation of the five Siemens turbines.

For details, view the entire article by subscribing to Industrial Info's Premium Industry News at http://www.industrialinfo.com/showNews.jsp?newsitemID=138949, or browse other breaking industrial news stories at www.industrialinfo.com.

Industrial Info Resources (IIR) is a marketing information service specializing in industrial process, energy and financial related markets with products and services ranging from industry news, analytics, forecasting, plant and project databases, as well as multimedia services. For more information send inquiries to powergroup@industrialinfo.com or visit us online at www.industrialinfo.com.

Related News Articles

Ecuador's San Francisco Hydropower Station Remains Offline

PDVSA's Willemstad Isla Refinery Forced to Shut Down Several Units

Petroecuador's Esmeraldas Refinery Delays Overhaul Because of Equipment Delivery Delay

Contact Information

  • Contact:
    Joe Govreau
    713-783-5147