SOURCE: Tara Gold Resources Corp.

September 11, 2007 13:33 ET

Tara Gold Provides Las Minitas Silver-Gold Project Update

CHICAGO, IL--(Marketwire - September 11, 2007) - Tara Gold Resources Corp. (PINKSHEETS: TRGD) (FRANKFURT: T8N) is pleased to announce that Pershimco, the Las Minitas operator, has now completed 8 diamond drill holes, with 1 hole in progress. Drilling has intersected tuffaceous units generally with 1-5% sulphides over significant core lengths ranging from 12 to 93 m, true widths of 9 to 70 m.

In May of 2007, Tara Gold signed an option agreement with Pershimco Resources Inc. giving Pershimco, as operator, an option to earn a 75% direct property interest by making cumulative payments of $1.8 million to Tara Gold, staged exploration work for a total of $5.2 million over 48 months, underlying properties payments of $3.4 million and issuing 750,000 shares to Tara Gold.

Pershimco has provided the following drill hole statistics:

              TARGET                    LENGTH
   DDH #     LOCATION  AZIMUTH / DIP     (M)            COMMENTS
----------- ----------- ----------- ------------- --------------------
LM-07-01    LAS MINITAS 000° / -45°     149.5            N/A
----------- ----------- ----------- ------------- --------------------
                                                     Same set-up as
                                                  LM-07-01; 40 m 1-5%
LM-07-02    LAS MINITAS 045° / -45°     180.0          sulphides
----------- ----------- ----------- ------------- --------------------
                                                  50 m SE of LM-07-01
                                                    and 02; 100 m of
LM-07-03    LAS MINITAS 045° / -45°     250.0        1-5% sulphides
----------- ----------- ----------- ------------- --------------------
                                                    At same site as
                                                    Hecla's historic
                                                     hole 92; 1-4%
LM-07-04      EL NEGRO  045° / -45°     146.0          sulphides
----------- ----------- ----------- ------------- --------------------
                                                   Repeat of LM-07-04
                                                    with additives to
                                                      improve core
                                                    recovery; 70 m of
LM-07-05      EL NEGRO  045° / -45°     147.5        1-4% sulphides
----------- ----------- ----------- ------------- --------------------
                                                  75 m NW of LM-07-04
                                                   and 05; near Hecla
                                                  historic hole 93; 12
LM-07-06      EL NEGRO  270° / -45°     150.0     m of 1-5% sulphides
----------- ----------- ----------- ------------- --------------------
                                                  NW of LM-07-06 near
                                                  Hecla historic hole
                                                    94; 93 m of 1-5%
LM-07-07      EL NEGRO  270° / -45°     212.0          sulphides
----------- ----------- ----------- ------------- --------------------
                                                      3 m south of
                                                    LM-07-07; 90 m of
LM-07-08      EL NEGRO  045° / -45°     150.0        1-5% sulphides
----------- ----------- ----------- ------------- --------------------
                                         30.0
LM-07-09      EL NEGRO  045° / -45° (in progress) 3.5 m NE of LM-07-06
----------- ----------- ----------- ------------- --------------------
TOTAL                                 1,415.0
----------- ----------- ----------- ------------- --------------------

Core is being logged, split, bagged and sealed on site, and sent to the ALS-Chemex facility in Hermosillo, Mexico, 300 km north of the project where samples will be processed and sent to Vancouver, BC, for final analysis. Assays and assaying protocols will be issued once results are made available to.

The information in this news release has been prepared and reviewed by Mr. Jean Lafleur, P. Geo., Director and Technical Advisor to Pershimco and is a Qualified Person under NI 43-101.

About Las Minitas

The 7,275 hectares Las Minitas Property is located in Sonora, Mexico, northwest of the town of Alamos, within the well known Sierra Madre Occidental gold-silver belt where a number of successful gold/silver exploration projects are ongoing.

About Tara Gold Resources Corp.

Tara Gold Resources Corp. is a growth-oriented precious metals exploration and development company with existing production plants. It is management's objective to become a significant gold and precious metals producer by re-initiating and increasing production levels at La Currita, Lluvia de Oro and Picacho, and developing the San Miguel, La Millionaria, and Las Minitas projects in Mexico. We continue to acquire other advanced-stage projects and/or producing mines in one of the most prolific precious metal districts in the world. For more information, please visit the Company's web site at: http://www.TaraGoldResources.com.

Safe Harbor Statement under the Private Securities Litigation Reform Act of 1995: The statements contained herein which are not historical are forward-looking statements that are subject to risks and uncertainties that could cause actual results to differ materially from those expressed in the forward-looking statements, including, but not limited to, certain delays beyond the company's control with respect to market acceptance of new technologies or products, delays in testing and evaluation of products, and other risks detailed from time to time in the Company's filings with the Securities and Exchange Commission.

Contact Information