Turquoise Hill Announces Third Quarter 2015 Production


VANCOUVER, BC--(Marketwired - October 15, 2015) - Turquoise Hill Resources (NYSE: TRQ) (NASDAQ: TRQ) (TSX: TRQ) today announced the third quarter 2015 production for Oyu Tolgoi.

Jeff Tygesen, Turquoise Hill Chief Executive Officer, said, "Third quarter mine production at Oyu Tolgoi was at record levels while concentrate produced and contained copper were on par with the previous quarter even considering the planned concentrator shutdown in July. Gold production decreased in the third quarter as a result of lower grades but is expected to increase in the fourth quarter."

During Q3'15, mined production increased 8.5% over Q2'15 due to shorter hauling routes and ongoing productivity initiatives. Copper in concentrates for Q3'15 increased 1.3% due to higher head grades. Gold in concentrates for the quarter decreased 48.5% over Q2'15 due to slower than anticipated access to gold-rich ore. Increased copper and gold production is expected in Q4'15 as higher-grade ore is accessed in the open pit.

Turquoise Hill continues to expect Oyu Tolgoi to produce 175,000 to 195,000 tonnes of copper and 600,000 to 700,000 ounces of gold in concentrates in 2015. The Company expects copper production to be at the top of the range while gold production is expected to be in the middle of the range.

Following the filing of revised schedules for the 2015 Oyu Tolgoi Feasibility Study with the Mongolian Minerals Council in August, pre-start activities are underway in parallel with an update to the capital estimate, which is expected to be completed in Q1'16. Pre-start activities include ramp-up of the owners and EPCM team, re-estimate activities, detailed engineering and early procurement for equipment and materials required for necessary critical works that are key enablers for recommencement of underground lateral development mining activity. The Company continues to expect signing of project financing by the end of 2015 and the decision for underground construction in early Q2'16.

Oyu Tolgoi Production Data

All data represents full production and sales on a 100% basis

                     
   1Q
2014
 2Q
2014
 3Q
2014
 4Q
2014
 1Q
2015
 2Q
2015
 3Q
2015
 9 months 2014  9 months 2015  Full Year 2014
                               
Open pit material mined ('000 tonnes)  21,621  16,861  19,493  18,944  21,999  22,094  23,969  57,975  68,063  76,919
Ore treated ('000 tonnes)  5,560  7,778  7,029  7,505  7,512  9,025  8,632  20,367  25,168  27,872
Average mill head grades:                              
 Copper (%)  0.52  0.53  0.59  0.74  0.52  0.69  0.75  0.55  0.66  0.60
 Gold (g/t)  0.49  0.60  0.80  1.46  0.48  1.09  0.56  0.64  0.73  0.86
 Silver (g/t)  1.52  1.57  1.64  1.65  1.16  1.46  1.90  1.58  1.52  1.60
Concentrates produced ('000 tonnes)  102.9  140.0  134.1  186.7  130.9  215.5  210.3  377.0  556.7  563.6
 Average concentrate grade (% Cu)  24.6  25.8  27.3  26.9  25.7  25.6  26.6  26.0  26.0  26.3
Production of metals in concentrates:                              
 Copper ('000 tonnes)  25.3  36.2  36.6  50.3  33.6  55.3  56.0  98.2  144.9  148.4
 Gold ('000 ounces)  66  113  132  278  86  238  123  311  446  589
 Silver ('000 ounces)  163  229  216  286  184  297  388  608  869  893
Concentrate sold ('000 tonnes)  48.2  202.5  220.3  262.7  167.7  189.8  226.0  471.0  583.5  733.7
Sales of metals in concentrates:                              
 Copper ('000 tonnes)  13.1  51.6  53.6  67.6  42.1  46.3  58.2  118.3  146.5  185.8
 Gold ('000 ounces)  28  126  144  263  200  177  200  298  577  561
 Silver ('000 ounces)  78  309  323  383  219  250  334  710  798  1,093
Metal recovery (%)                              
 Copper  87.9  87.6  89.3  90.7  86.8  88.6  86.4  88.4  87.3  89.1
 Gold  75.5  74.8  74.8  78.6  71.6  75.6  76.4  75.0  74.4  76.6
 Silver  59.3  58.6  58.6  71.6  65.4  70.6  73.0  58.8  69.6  62.3
                         

About Turquoise Hill Resources

Turquoise Hill Resources (NYSE: TRQ) (NASDAQ: TRQ) (TSX: TRQ) is an international mining company whose primary operation is its 66% interest in the Oyu Tolgoi copper-gold-silver mine in southern Mongolia.

Follow us on Twitter @TurquoiseHillRe

Forward-looking statements

Certain statements made herein, including statements relating to matters that are not historical facts and statements of the Company's beliefs, intentions and expectations about developments, results and events which will or may occur in the future, constitute "forward-looking information" within the meaning of applicable Canadian securities legislation and "forward-looking statements" within the meaning of the "safe harbor" provisions of the U.S. Private Securities Litigation Reform Act of 1995. Forward-looking information and statements relate to future events or future performance, reflect current expectations or beliefs regarding future events and are typically identified by words such as "anticipate", "could", "should", "expect", "seek", "may", "intend", "likely", "plan", "estimate", "will", "believe" and similar expressions suggesting future outcomes or statements regarding an outlook. These include, but are not limited to, statements respecting anticipated business activities, planned expenditures, corporate strategies and other statements that are not historical facts.

Forward-looking statements and information are made based upon certain assumptions and other important factors that, if untrue, could cause the actual results, performance or achievements of the Company to be materially different from future results, performance or achievements expressed or implied by such statements or information. There can be no assurances that such statements or information will prove accurate. Such statements and information contained herein represent the Company's best judgment as of the date hereof based on information currently available. The Company does not assume any obligation to update any forward-looking statements or information or to conform these forward-looking statements or information to actual results, except as required by law.

Important factors that could cause actual results to differ from these forward-looking statements and information are included in the "Risk Factors" section of the Annual Information Form dated as of March 20, 2015 in respect of the year ended December 31, 2014.

Contact Information:

Contact
Investors and Media

Tony Shaffer
+1 604 648 3934
Email: tony.shaffer@turquoisehill.com